42000bph Drinking Pure Mineral Water Bottled Filling Line
The system is made up of several components, including a bottle blowing machine, a water treatment system, a filling machine, a labeling machine and a packaging machine. Each component is designed to work seamlessly with the others, resulting in a smooth, continuous and efficient bottling process.
The bottle blowing machine is designed to produce high-quality bottles with consistent shapes and sizes. This ensures that the bottles can be filled and capped accurately and efficiently. The water treatment system is an essential component that ensures that the water used in the bottling process meets the highest standards of purity and quality.
The filling machine is equipped with advanced technology that allows it to fill bottles quickly and accurately. It is capable of filling up to 42,000 bottles per hour, making it one of the fastest bottling lines in the industry. The labeling machine is designed to apply labels accurately and consistently to each bottle, while the packaging machine ensures that the bottles are packed securely for transport.
Overall, the 42000bph Drinking Pure Mineral Water Bottled Filling Line is an excellent investment for companies that produce high volumes of pure mineral water. It is a reliable and efficient system that ensures consistent quality and meets the growing demand for pure water. With its advanced technology and features, it is sure to exceed your expectations and help you achieve your business goals.
Working process as follows:
Put performs into hopper → Elevator send performs to arraying system → Array the preforms → Perform loading → Preform heating → Robot put the heated performs into moulds Lock the moulds and start blowing → Finish blowing→ Robot takeout the bottles → Bottle outlet
The electric control system can make control of automation, carrying out strict control in the process of elevating, arraying, loading, heating and blowing. Human interface achieves central control.
Working principle of blow molding machine:
Main wheel of equipment rotates in high speed. The encoder at the top of equipment and sensors installed on the main wheel test the angle of rotation and give computer feedback. Then in accordance with the operator of the procedures it set (angle) issued directives to executing agency(electromagnetic valve). The implementation process of blowing on a specific time, resulting to complete the process of a two-step blowing and produce qualified products in rotating equipment.
1. Air compressor without oil: supply needed working pressure in the normal working(0.8Mpa) and high pressure for completing high pressure blowing.
2. Water chiller: The cooling system consist of cooling tower supplies cooling effect for air compressor without oil, blowing machine, hot water chiller and temperature control(oil).If the bottle is for water or carbonated, the cooling tower supply cooling water for buttom bottle mould and bottle mould; It needs hot water machine and temperature control(oil) if it is hot-filling bottle.
3. Hot water machine: the function is supplying steady hot water for buttom of mould, make the buttom of mould have steady temperature, ensure the blowing temperature.
4. Temperature control: the function is mainly provide a stable temperature for bottle body mould, make crystal of bottle material, meet the hot-filling requirements for bottle distortion. Heating media used in temperature control is industrial heat conductivity oil.